Seung-Chul Kim
- 현장계측과 수치해석에 의한 쉴드TBM 터널의 지표침하 예측모델 (Model for predicting ground surface settlement by field measuring and numerical analysis in shield TBM tunnel). In: Journal of Korean Tunnelling and Underground Space Association (한국터널지하공간학회 논문집), v. 15, n. 3 ( 2013). (2013):