- Estimating Hypothetical Competitive Bid Price on Bid-rigged Projects Based on the Weights of Major Work Groups. In: KSCE Journal of Civil Engineering, v. 28, n. 8 (22 Juni 2024). (2024):
- (2022): Application Issues of Impacted As-Planned Schedule for Delay Analysis. In: Buildings, v. 12, n. 9 (16 September 2022).
- Blockchain-Based Automatic Tracking and Extracting Construction Document for Claim and Dispute Support. In: KSCE Journal of Civil Engineering, v. 26, n. 9 (1 August 2022). (2022):
- Optimum Location Analysis for an Infrastructure Maintenance Depot in Urban Railway Networks. In: KSCE Journal of Civil Engineering, v. 25, n. 6 (März 2021). (2021):
- Estimating Damages of Bid-Rigging in Design-Build Contracts Based on Simulation Model. In: KSCE Journal of Civil Engineering, v. 25, n. 5 (12 März 2021). (2021):
- Environmental Load Estimating Model of NATM Tunnel based on Standard Quantity of Major Works in the Early Design Phase. In: KSCE Journal of Civil Engineering, v. 22, n. 4 (Juni 2017). (2017):