W. Kidd
- A Method of Constructing the Subaqueous Part of Piers and Breakwaters with Soft Un-Set Concrete. In: Minutes of the Proceedings of the Institution of Civil Engineers, v. 105, n. 1891-3 ( 1891). (1891):
- On the Blasting and Removal of Rock under Water, and the Construction of a Deep Water Quay, at Blyth Harbour. In: Minutes of the Proceedings of the Institution of Civil Engineers, v. 81, n. 1885-3 ( 1885). (1885):