M. Khanzadi
- Multi-objective Billiards-Inspired Optimization Algorithm for Construction Management Problems. In: Iranian Journal of Science and Technology, Transactions of Civil Engineering, v. 45, n. 4 (September 2021). (2021):
- Billiards-inspired optimization algorithm; a new meta-heuristic method. In: Structures, v. 27 (Oktober 2020). (2020):
- Support vector machine for prediction of the compressive strength of no-slump concrete. In: Computers and Concrete, v. 11, n. 4 (April 2013). (2013):
- Fuzzy Resource Constraint Project Scheduling Problem Using CBO and CSS Algorithms. In: International Journal of Civil Engineering, v. 14, n. 5 (Mai 2016). (2016):
- Stochastic time–cost optimization using non-dominated archiving ant colony approach. In: Automation in Construction, v. 20, n. 8 (Dezember 2011). (2011):
- Construction Site Layout Planning Problem Using Two New Meta-heuristic Algorithms. In: Iranian Journal of Science and Technology, Transactions of Civil Engineering, v. 40, n. 4 ( 2016). (2016):
- Application of CBO and CSS for Resource Allocation and Resource Leveling Problem. In: Iranian Journal of Science and Technology, Transactions of Civil Engineering, v. 40, n. 1 ( 2016). (2016):