Heng Jiang
- Nonlinear buckling analysis of cat-head transmission tower under strong wind load. In: Journal of Physics: Conference Series, v. 2584, n. 1 (1 September 2023). (2023):
- Wave characteristics of reconfigurable elastic metamaterials based on a multi-stable structure. In: Engineering Structures, v. 280 (April 2023). (2023):
- A panel vector error correction approach to forecasting demand in regional construction markets. In: Construction Management and Economics, v. 32, n. 12 (Dezember 2014). (2014):
- Spatial linkages among Australian construction markets. In: Australasian Journal of Construction Economics and Building, v. 14, n. 2 (Juni 2014). (2014):
- The effects of the late 2000s global financial crisis on Australia's construction demand. In: Australasian Journal of Construction Economics and Building, v. 13, n. 3 (September 2013). (2013):
- Construction Price Prediction Using Vector Error Correction Models. In: Journal of Construction Engineering and Management, v. 139, n. 11 (November 2013). (2013):
- Forecasting construction demand: a vector error correction model with dummy variables. In: Construction Management and Economics, v. 29, n. 9 (September 2011). (2011):