Yuanshen Ji
- Optimized Planning Approach for Multiple Tower Cranes and Material Supply Points Using Mixed-Integer Programming. In: Journal of Construction Engineering and Management, v. 146, n. 3 (März 2020). (2020):
- Automated tower crane planning: leveraging 4-dimensional BIM and rule-based checking. In: Automation in Construction, v. 93 (September 2018). (2018):