- Company and Project Evaluation Model for Privately Promoted Infrastructure Projects. In: Journal of Construction Engineering and Management, v. 122, n. 1 (März 1996). (1996):
- Risk-Sensitive Competitive Bidding Model and Impact of Risk Aversion and Cost Uncertainty on Optimum Bid. In: Journal of Construction Engineering and Management, v. 148, n. 3 (März 2022). (2022):
- Friedman's Bidding Model: Errors and Corrections. In: Journal of Construction Engineering and Management, v. 145, n. 10 (Oktober 2019). (2019):
- Bidding Models—Symmetry and State of Information. In: Journal of Construction Engineering and Management, v. 114, n. 2 (Juni 1988). (1988):
- Geologic Prediction Model for Tunneling. In: Journal of Construction Engineering and Management, v. 113, n. 4 (Dezember 1987). (1987):
- Advanced Building Technology Matrix System. In: Journal of Construction Engineering and Management, v. 114, n. 4 (Dezember 1988). (1988):
- Pilot Tunnels: Contractor's Position. In: Journal of Construction Engineering and Management, v. 114, n. 4 (Dezember 1988). (1988):
- Geologic Exploration and Risk Reduction in Underground Construction. In: Journal of Construction Engineering and Management, v. 114, n. 4 (Dezember 1988). (1988):
- Dynamic Probabilistic Decision Processes. In: Journal of Construction Engineering and Management, v. 115, n. 2 (Juni 1989). (1989):
- Evaluation of Subsurface Exploration Programs. In: Journal of Construction Engineering and Management, v. 115, n. 3 (September 1989). (1989):
- Average‐Bid Method—Competitive Bidding Strategy. In: Journal of Construction Engineering and Management, v. 119, n. 1 (März 1993). (1993):
- Debt Capacity and Optimal Capital Structure for Privately Financed Infrastructure Projects. In: Journal of Construction Engineering and Management, v. 121, n. 4 (Dezember 1995). (1995):
- General-Purpose Systems for Effective Construction Simulation. In: Journal of Construction Engineering and Management, v. 125, n. 4 (August 1999). (1999):
- Scheduling Projects with Repeating Activities. In: Journal of Construction Engineering and Management, v. 124, n. 4 (Juli 1998). (1998):
- Comparison of Construction Alternatives Using Matched Simulation Experiments. In: Journal of Construction Engineering and Management, v. 122, n. 3 (September 1996). (1996):
- Below-Average Bidding Method. In: Journal of Construction Engineering and Management, v. 136, n. 9 (September 2010). (2010):
- Repetitive Scheduling Method: Requirements, Modeling, and Implementation. In: Journal of Construction Engineering and Management, v. 142, n. 5 (Mai 2016). (2016):
- Scheduling system with focus on practical concerns in repetitive projects. In: Construction Management and Economics, v. 22, n. 6 (Juli 2004). (2004):