Kirsty Hunter
- A whole life costing input tool for surveyors in UK local government. In: Structural Survey, v. 23, n. 5 (Dezember 2005). (2005):
- Investigation of Critical Success Factors in Construction Project Briefing by Way of Content Analysis. In: Journal of Construction Engineering and Management, v. 132, n. 11 (November 2006). (2006):
- Comparative Study of the Variables in Construction Project Briefing/Architectural Programming. In: Journal of Construction Engineering and Management, v. 134, n. 2 (Februar 2008). (2008):