Youngki Huh
- Comparative simulation analysis of pavement technology for a decision support system in the U.S. road renewal industry. In: KSCE Journal of Civil Engineering, v. 18, n. 4 (November 2013). (2013):
- Crew Production Rates for Contract Time Estimation: Beam Erection, Deck, and Rail of Highway Bridges. In: Journal of Construction Engineering and Management, v. 132, n. 4 (April 2006). (2006):
- Productivity analysis of steel works for cost estimation of public projects in Korea. In: KSCE Journal of Civil Engineering, v. 16, n. 1 (Dezember 2011). (2011):
- Crew Production Rates for Contract Time Estimation: Bent Footing, Column, and Cap of Highway Bridges. In: Journal of Construction Engineering and Management, v. 131, n. 9 (September 2005). (2005):