- Optimal Sharing of Construction Project Outcomes with Downstream Contracting Parties: Principal–Agent Analysis. In: Journal of Construction Engineering and Management, v. 150, n. 2 (Februar 2024). (2024):
- Optimizing the distribution of outcomes across multiple levels of subcontracting in construction projects. In: Engineering, Construction and Architectural Management. :
- Sustainable production of buildings based on Iranian vernacular patterns: A water footprint analysis. In: Building and Environment, v. 242 (August 2023). (2023):
- Markets, Hierarchies, or Hybrids as Alternative Governance Structures in Construction Contracts: Transaction Cost Economics Analysis. In: Journal of Construction Engineering and Management, v. 149, n. 1 (Januar 2023). (2023):
- Intelligent Stochastic Agent-Based Model for Predicting Truck Production in Construction Sites by Considering Learning Effect. In: Journal of Construction Engineering and Management, v. 148, n. 5 (Mai 2022). (2022):
- Developing a Model for Assessing Project Completion Time Reliability during Construction Using Time-Dependent Reliability Theory. In: Journal of Construction Engineering and Management, v. 148, n. 4 (April 2022). (2022):
- Appropriate Types of Payments in Construction Contracts Based on Agency Theory Parameters. In: Journal of Construction Engineering and Management, v. 148, n. 1 (Januar 2022). (2022):
- Assessing the effect of structural parameters and building site in achieving low carbon building materialization using a life-cycle assessment approach. In: Journal of Building Engineering, v. 44 (Dezember 2021). (2021):
- Empirical Models for Prediction of Frost Resistance of Normal- and High-Strength Concretes. In: Iranian Journal of Science and Technology, Transactions of Civil Engineering, v. 45, n. 4 (September 2021). (2021):
- An optimal target cost contract with a risk neutral owner. In: Engineering, Construction and Architectural Management, v. 21, n. 5 (September 2014). (2014):
- An optimum multiple outcomes sharing model with multiple risk-averse agents. In: Engineering, Construction and Architectural Management, v. 28, n. 9 (März 2021). (2021):
- Optimum Outcome-Sharing Construction Contracts with Multiagent and Multioutcome Arrangements. In: Journal of Construction Engineering and Management, v. 146, n. 7 (Juli 2020). (2020):
- Optimal Outcome Sharing With A Consortium of Contractors. In: Journal of Civil Engineering and Management, v. 22, n. 5 (Mai 2016). (2016):
- An optimal time incentive/disincentive -based compensation in contracts with multiple agents. In: Construction Economics and Building, v. 16, n. 4 (Dezember 2016). (2016):
- Optimal Incentive Contract with Risk-Neutral Contractor. In: Journal of Construction Engineering and Management, v. 139, n. 8 (August 2013). (2013):
- Novel Internal-Deterioration Model of Concrete Exposed to Freeze-Thaw Cycles. In: Journal of Materials in Civil Engineering (ASCE), v. 29, n. 9 (September 2017). (2017):