-
Jia, Yilong / Wang, Jun / Shou, Wenchi / Hosseini, M. Reza / Bai, Yu (2023): Graph neural networks for construction applications. In: Automation in Construction, v. 154 (Oktober 2023).
https://doi.org/10.1016/j.autcon.2023.104984
-
Alsharif, Rashed / Arashpour, Mehrdad / Golafshani, Emadaldin Mohammadi / Hosseini, M. Reza / Chang, Victor / Zhou, Jenny (2022): Machine learning-based analysis of occupant-centric aspects: Critical elements in the energy consumption of residential buildings. In: Journal of Building Engineering, v. 46 (April 2022).
https://doi.org/10.1016/j.jobe.2021.103846
-
Rahimian, Ali / Hosseini, M. Reza / Martek, Igor / Taroun, Abdulmaten / Alvanchi, Amin / Odeh, Ibrahim (2022): Predicting communication quality in construction projects: A fully-connected deep neural network approach. In: Automation in Construction, v. 139 (Juli 2022).
https://doi.org/10.1016/j.autcon.2022.104268
-
Sompolgrunk, Apeesada / Banihashemi, Saeed / Hosseini, M. Reza / Golzad, Hamed / Hajirasouli, Aso (2022): An integrated model of BIM return on investment for Australian small- and medium-sized enterprises (SMEs). In: Engineering, Construction and Architectural Management, v. 30, n. 5 (Februar 2022).
https://doi.org/10.1108/ecam-09-2021-0839
-
Elghaish, Faris / Rahimian, Farzad Pour / Hosseini, M. Reza / Edwards, David / Shelbourn, Mark (2022): Financial management of construction projects: Hyperledger fabric and chaincode solutions. In: Automation in Construction, v. 137 (Mai 2022).
https://doi.org/10.1016/j.autcon.2022.104185
-
Mirzaee, Ali Mohammad / Hosseini, M. Reza / Martek, Igor / Rahnamayiezekavat, Payam / Arashpour, Mehrdad (2022): Mitigation of contractual breaches in international construction joint ventures under conditions of absent legal recourse: case studies from Iran. In: Engineering, Construction and Architectural Management, v. 30, n. 4 (März 2022).
https://doi.org/10.1108/ecam-08-2021-0751
-
Ansari, Ramin / Khalilzadeh, Mohammad / Hosseini, M. Reza (2022): A Multi-objective Dynamic Optimization Approach to Project Schedule Management: A Case Study of a Gas Field Construction. In: KSCE Journal of Civil Engineering, v. 26, n. 3 (14 Januar 2022).
https://doi.org/10.1007/s12205-021-0410-5
-
Brandão, Rayra / Hosseini, M. Reza / Macêdo, Alcebíades N. / Melo, André C. / Martek, Igor (2021): Public administration strategies that stimulate reverse logistics within the construction industry: a conceptual typology. In: Engineering, Construction and Architectural Management, v. 29, n. 8 (Juli 2021).
https://doi.org/10.1108/ecam-07-2020-0547
-
Ghansah, Frank Ato / Owusu-Manu, De-Graft / Ayarkwa, Joshua / Edwards, David John / Hosseini, M. Reza (2021): Exploration of latent barriers inhibiting project management processes in adopting smart building technologies (SBTs) in the developing countries. In: Construction Innovation, v. 21, n. 4 (August 2021).
https://doi.org/10.1108/ci-07-2020-0116
-
Jiang, Weiling / Martek, Igor / Hosseini, M. Reza / Chen, Chuan / Ma, Le (2019): Foreign Direct Investment in Infrastructure Projects: Taxonomy of Political Risk Profiles in Developing Countries. In: Journal of Infrastructure Systems, v. 25, n. 3 (September 2019).
https://doi.org/10.1061/(asce)is.1943-555x.0000503
-
Nikmehr, Bahareh / Hosseini, M. Reza / Rameezdeen, Raufdeen / Chileshe, Nicholas / Ghoddousi, Parviz / Arashpour, Mehrdad (2017): An integrated model for factors affecting construction and demolition waste management in Iran. In: Engineering, Construction and Architectural Management, v. 24, n. 6 (November 2017).
https://doi.org/10.1108/ecam-01-2016-0015
-
Roberts, C. J. / Edwards, David John / Hosseini, M. Reza / Mateo-Garcia, Monica / Owusu-Manu, De-Graft (2019): Post-occupancy evaluation: a review of literature. In: Engineering, Construction and Architectural Management, v. 26, n. 9 (September 2019).
https://doi.org/10.1108/ecam-09-2018-0390
-
Jiang, Weiling / Martek, Igor / Hosseini, M. Reza / Chen, Chuan (2021): Political risk management of foreign direct investment in infrastructure projects. Bibliometric-qualitative analyses of research in developing countries. In: Engineering, Construction and Architectural Management, v. 28, n. 1 ( 2021).
https://doi.org/10.1108/ecam-05-2019-0270
-
Edwards, David John / Rillie, Iain / Chileshe, Nicholas / Lai, Joesph / Hosseini, M. Reza / Thwala, Wellington Didibhuku (2020): A field survey of hand–arm vibration exposure in the UK utilities sector. In: Engineering, Construction and Architectural Management, v. 27, n. 9 ( 2020).
https://doi.org/10.1108/ecam-09-2019-0518
-
Ghosh, Arka / Edwards, David John / Hosseini, M. Reza (2021): Patterns and trends in Internet of Things (IoT) research: future applications in the construction industry. In: Engineering, Construction and Architectural Management, v. 28, n. 2 ( 2021).
https://doi.org/10.1108/ecam-04-2020-0271
-
Li, Hong Xian / Zhang, Yitao / Edwards, David / Hosseini, M. Reza (2020): Improving the energy production of roof-top solar PV systems through roof design. In: Building Simulation, v. 13, n. 2 (Februar 2020).
https://doi.org/10.1007/s12273-019-0585-6
-
Edwards, David John / Martek, Igor / Ejohwomu, Obuks / Aigbavboa, Clinton / Hosseini, M. Reza (2020): Hand-arm vibration management: an operational health and safety strategy framework. In: International Journal of Building Pathology and Adaptation, v. 39, n. 5 (Dezember 2020).
https://doi.org/10.1108/ijbpa-09-2020-0079
-
Casasayas, Oskar / Hosseini, M. Reza / Edwards, D. J. / Shuchi, Sarah / Chowdhury, Mahmuda (2021): Integrating BIM in Higher Education Programs: Barriers and Remedial Solutions in Australia. In: Journal of Architectural Engineering (ASCE), v. 27, n. 1 (März 2021).
https://doi.org/10.1061/(asce)ae.1943-5568.0000444
-
Ghosh, Arka / Edwards, David John / Hosseini, M. Reza / Al-Ameri, Riyadh / Abawajy, Jemal / Thwala, Wellington Didibhuku (2020): Real-time structural health monitoring for concrete beams: a cost-effective ‘Industry 4.0’ solution using piezo sensors. In: International Journal of Building Pathology and Adaptation, v. 39, n. 2 (Mai 2020).
https://doi.org/10.1108/ijbpa-12-2019-0111
-
Elghaish, Faris / Abrishami, Sepehr / Hosseini, M. Reza (2020): Integrated project delivery with blockchain: An automated financial system. In: Automation in Construction, v. 114 (Juni 2020).
https://doi.org/10.1016/j.autcon.2020.103182
-
Hosseini, M. Reza / Roelvink, Rogier / Papadonikolaki, Eleni / Edwards, David John / Pärn, Erika (2018): Integrating BIM into facility management. Typology matrix of information handover requirements. In: International Journal of Building Pathology and Adaptation, v. 36, n. 1 (April 2018).
https://doi.org/10.1108/ijbpa-08-2017-0034
-
Owusu-Manu, De-Graft / Edwards, David John / Donkor-Hyiaman, Ken A. / Asiedu, Richard Ohene / Hosseini, M. Reza / Obiri-Yeboah, E. (2019): Housing attributes and relative house prices in Ghana. In: International Journal of Building Pathology and Adaptation, v. 37, n. 5 (Oktober 2019).
https://doi.org/10.1108/ijbpa-01-2019-0003
-
Hosseini, M. Reza / Chileshe, Nicholas / Zillante, George (2014): Investigating the Factors Associated with Job Satisfaction of Construction Workers in South Australia. In: Australasian Journal of Construction Economics and Building, v. 14, n. 3 (September 2014).
https://doi.org/10.5130/ajceb.v14i3.4154
-
Elghaish, Faris / Abrishami, Sepehr / Hosseini, M. Reza / Abu-Samra, Soliman / Gaterell, Mark (2019): Integrated project delivery with BIM: An automated EVM-based approach. In: Automation in Construction, v. 106 (Oktober 2019).
https://doi.org/10.1016/j.autcon.2019.102907
-
Hosseini, M. Reza / Bosch-Sijtsema, Petra / Arashpour, Mehrdad / Chileshe, Nicholas / Merschbrock, Christoph (2018): A qualitative investigation of perceived impacts of virtuality on effectiveness of hybrid construction project teams. In: Construction Innovation, v. 18, n. 1 (Januar 2018).
https://doi.org/10.1108/ci-10-2016-0052
-
Zaeri, Fahimeh / Rotimi, James Olabode Bamidele / Hosseini, M. Reza / Cox, Jeff (2017): Implementation of the LPS using an excel spreadsheet: a case study from the New Zealand construction industry. In: Construction Innovation, v. 17, n. 3 (Mai 2017).
https://doi.org/10.1108/ci-01-2016-0002
-
Hosseini, M. Reza / Chileshe, Nicholas / Baroudi, Bassam / Zuo, Jian / Mills, Anthony (2016): Factors affecting perceived level of virtuality in hybrid construction project teams (HCPTs). A qualitative study. In: Construction Innovation, v. 16, n. 4 (Oktober 2016).
https://doi.org/10.1108/ci-05-2015-0029
-
Mignone, Gerard / Hosseini, M. Reza / Chileshe, Nicholas / Arashpour, Mehrdad (2016): Enhancing collaboration in BIM-based construction networks through organisational discontinuity theory: a case study of the new Royal Adelaide Hospital. In: Architectural Engineering and Design Management, v. 12, n. 5 (Juli 2016).
https://doi.org/10.1080/17452007.2016.1169987
-
Ghodoosi, Farzad / Bagchi, Ashutosh / Zayed, Tarek / Hosseini, M. Reza (2018): Method for developing and updating deterioration models for concrete bridge decks using GPR data. In: Automation in Construction, v. 91 (Juli 2018).
https://doi.org/10.1016/j.autcon.2018.03.014
-
Banihashemi, Saeed / Tabadkani, Amir / Hosseini, M. Reza (2018): Integration of parametric design into modular coordination: A construction waste reduction workflow. In: Automation in Construction, v. 88 (April 2018).
https://doi.org/10.1016/j.autcon.2017.12.026