0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Md. Mehrab Hossain ORCID

Die folgende Bibliografie enthält alle in dieser Datenbank indizierten Veröffentlichungen, die mit diesem Namen als Autor, Herausgeber oder anderweitig Beitragenden verbunden sind.

  1. Mottakin, Md / Datta, Shuvo Dip / Hossain, Md. Mehrab / Sobuz, Md. Habibur Rahman / Rahman, Sm Arifur / Alharthai, Mohammad (2024): Evaluation of textile effluent treatment plant sludge as supplementary cementitious material in concrete using experimental and machine learning approaches. In: Journal of Building Engineering, v. 96 (November 2024).

    https://doi.org/10.1016/j.jobe.2024.110627

  2. Ali, Md. Shajahan / Meem, Tamanna Islam / Hossain, Md. Mehrab / Ahmad, Syed Ishtiaq: Unraveling the underlying causes and consequences of construction safety neglect: a multiperspective analysis of the Bangladeshi construction industry. In: International Journal of Building Pathology and Adaptation.

    https://doi.org/10.1108/ijbpa-01-2024-0018

  3. Khondoker, Md. Tareq Hossain / Hossain, Md. Mehrab / Saha, Ayan: 4D BIM integrated optimization of construction steel bar procurement plan for limited storage capacity. In: Construction Innovation.

    https://doi.org/10.1108/ci-12-2022-0310

  4. Hossain, Md. Mehrab / Ahmed, Shakil / Anam, S. M. Asif / Baxramovna, Irmatova Aziza / Meem, Tamanna Islam / Sobuz, Md. Habibur Rahman / Haq, Iffat: BIM-based smart safety monitoring system using a mobile app: a case study in an ongoing construction site. In: Construction Innovation.

    https://doi.org/10.1108/ci-11-2022-0296

  5. Nila, Nadira Islam / Akter, Jhumana / Hossain, Md. Mehrab: Change order effects on labor productivity and mitigation the effects by developing policies using system dynamic modeling: a case study in a construction project. In: International Journal of Building Pathology and Adaptation.

    https://doi.org/10.1108/ijbpa-11-2022-0184

  6. Meem, Tamanna Islam / Hossain, Md. Mehrab / Akter, Jhumana: BIM-based analysis of construction safety tracking using behavior-based safety in Bangladeshi construction industry. In: International Journal of Building Pathology and Adaptation.

    https://doi.org/10.1108/ijbpa-06-2022-0090

  7. Nafe Assafi, Mohammad / Hossain, Md. Mehrab / Chileshe, Nicholas / Datta, Shuvo Dip (2022): Development and validation of a framework for preventing and mitigating construction delay using 4D BIM platform in Bangladeshi construction sector. In: Construction Innovation, v. 23, n. 5 (August 2022).

    https://doi.org/10.1108/ci-08-2021-0160

  8. Nafe Assafi, Mohammad / Hoque, Md. Ikramul / Hossain, Md. Mehrab (2022): Investigating the causes of construction delay on the perspective of organization-sectors involved in the construction industry of Bangladesh. In: International Journal of Building Pathology and Adaptation, v. 42, n. 4 (Mai 2022).

    https://doi.org/10.1108/ijbpa-10-2021-0137

  9. Ahmed, Shakil / Hossain, Md. Mehrab / Haq, Iffat (2020): Implementation of lean construction in the construction industry in Bangladesh: awareness, benefits and challenges. In: International Journal of Building Pathology and Adaptation, v. 39, n. 2 (Mai 2020).

    https://doi.org/10.1108/ijbpa-04-2019-0037

Eine Veröffentlichung suchen...

Nur verfügbar mit
Mein Structurae

Volltext
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine