Richard Hornby
- (2024): Management of Corrosion Damage in Locked Coil Cables of the Galecopper Bridge: Case Study, Detection, Assessment, and Strengthening. Vorgetragen bei: IABSE Symposium: Construction’s Role for a World in Emergency, Manchester, United Kingdom, 10-14 April 2024.
- (2023): Independent Design Verification of 1915 Çanakkale Bridge:Global Analyses of Construction Stages. Vorgetragen bei: IABSE Symposium: Long Span Bridges, Istanbul, Turkey, 26-28 April 2023.
- Crossing the Forth. In: Civil Engineering Magazine, v. 89, n. 1 (Januar 2019). (2019):
- Puente de Queensferry. Diseño conceptual y diseño base. Vorgetragen bei: VII Congreso Internacional de Estructuras, Congreso de la Asociación Científico-Técnica del Hormigón Estructural (ACHE), A Coruña, 20-22 de junio de 2017. (2017):
- Queensferry Crossing, Scotland – scheme, specimen and definition designs. In: Proceedings of the Institution of Civil Engineers - Bridge Engineering, v. 172, n. 2 (Juni 2019). (2019):
- (2013): Humber Bridge A-frame rocker bearings replacement. Vorgetragen bei: IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013.
- (2015): Construction of Humber Bridge A-Frame rocker bearing replacement. Vorgetragen bei: IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015.
- Forth Replacement Crossing - Specimen Design and Construction Planning. Vorgetragen bei: 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011. (2011):
- The Rhine bridge at Köln-Rodenkirchen. Widening and reconstruction of an existing suspension bridge (Germany). Vorgetragen bei: International Conference IABSE-FIP: Ponts suspendus et à haubans = Cable-stayed and suspension bridges, Deauville, France, 12-15 October 1994. (1994):