G. Holmes
- Measurement of temporary prop loads at Mayfair car park. In: Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, v. 137, n. 3 (Juli 1999). (1999):
- Construction monitoring of cut and cover tunnels. In: Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, v. 158, n. 4 (Oktober 2005). (2005):
- Construction of a deep shaft for Crossrail. In: Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, v. 161, n. 6 (Dezember 2008). (2008):