- (2022): Tool characterisation framework for parametric building LCA. In: IOP Conference Series: Earth and Environmental Science, v. 1078, n. 1 (1 September 2022).
- Towards digital twinning for multi-domain simulation workflows in urban design: a case study in Gothenburg. In: Journal of Building Performance Simulation. :
- Identifying influential architectural design variables for early-stage building sustainability optimization. In: Building and Environment, v. 252 (März 2024). (2024):
- Environmental impacts of circularity in the built environment: How do system boundaries affect decision support?. In: Developments in the Built Environment, v. 18 (April 2024). (2024):
- Life Cycle Cost and Life Cycle Assessment of Composite Bridge with Flat and Corrugated Webs. In: ce/papers, v. 6, n. 3-4 (September 2023). (2023):
- BIM4EarlyLCA: An interactive visualization approach for early design support based on uncertain LCA results using open BIM. In: Developments in the Built Environment, v. 16 (Dezember 2023). (2023):
- Circular information flows in industrialized housing construction: the case of a multi-family housing product platform in Sweden. In: Construction Innovation, v. 24, n. 5 (Juni 2023). (2023):
- BIM-based LCSA application in early design stages using IFC. In: Automation in Construction, v. 138 (Juni 2022). (2022):
- What is the optimal robust environmental and cost-effective solution for building renovation? Not the usual one. In: Energy and Buildings, v. 251 (November 2021). (2021):
- Review of visualising LCA results in the design process of buildings. In: Building and Environment, v. 190 (März 2021). (2021):
- Statistical method to identify robust building renovation choices for environmental and economic performance. In: Building and Environment, v. 183 (Oktober 2020). (2020):
- Database of Embodied Quantity Outputs: Lowering Material Impacts Through Engineering. In: Journal of Architectural Engineering (ASCE), v. 26, n. 3 (September 2020). (2020):
- Top-down or bottom-up? – How environmental benchmarks can support the design process. In: Building and Environment, v. 153 (April 2019). (2019):
- LCA and BIM: Visualization of environmental potentials in building construction at early design stages. In: Building and Environment, v. 140 (August 2018). (2018):
- Requirements for applying LCA-based environmental impact assessment tools in the early stages of building design. In: Building and Environment, v. 133 (April 2018). (2018):
- Evaluation of BIM-based LCA results for building design. In: Automation in Construction, v. 109 (Januar 2020). (2020):