Brian Hobbs
- Beams strengthened by epoxy bonded steel plates. Vorgetragen bei: IABSE Symposium: Durability of Structures = Durabilité des constructions = Dauerhaftigkeit von Bauwerken, Lisbon, Portugal, 6-8 September 1989. (1989):
- Development of an integrated information resource base for 4D/VR construction processes simulation. In: Automation in Construction, v. 12, n. 2 (März 2003). (2003):
- Development of automated communication of system for managing site information using internet technology. In: Automation in Construction, v. 11, n. 5 (August 2002). (2002):
- Stockyard layout planning in precast concrete products industry: a case study and proposed framework. In: Construction Management and Economics, v. 19, n. 4 (Juli 2001). (2001):
- Flowshop scheduling model for bespoke precast concrete production planning. In: Construction Management and Economics, v. 23, n. 1 (Januar 2005). (2005):
- Inelastic Design of Infilled Frames. In: Journal of Structural Engineering (ASCE), v. 121, n. 4 (April 1995). (1995):