K. Hirano
- 大規模下水処理場の合理化施工と品質確保の取組み (An Approach towards Rationalized Construction Method and Quality Assurance at a Large Scale Sewerage Plant Site). In: Concrete Journal (JCI), v. 53, n. 8 ( 2015). (2015):
- 新名神高速道路 朝明川橋,小牧高架橋の下部工施工におけるひび割れ防止対策 (Crack Control Measures for Substructure Construction in the New Meishin Expressway). In: Concrete Journal (JCI), v. 52, n. 6 ( 2014). (2014):