-
Bagheri, S. Marzieh / Taghaddos, Hosein / Hermann, Ulrich (2024): Automated safety and practicality enhancement of lift plans in modular construction. In: Automation in Construction, v. 168 (Dezember 2024).
https://doi.org/10.1016/j.autcon.2024.105731
-
Taghaddos, Maedeh / Mousaei, Ali / Taghaddos, Hosein / Hermann, Ulrich / Mohamed, Yasser / AbouRizk, Simaan (2024): Optimized variable resource allocation framework for scheduling of fast-track industrial construction projects. In: Automation in Construction, v. 158 (Februar 2024).
https://doi.org/10.1016/j.autcon.2023.105208
-
Taghaddos, Maedeh / Pereira, Estacio / Osorio-Sandoval, Carlos / Hermann, Ulrich / AbouRizk, Simaan (2023): A Data-Driven Approach for Deploying Safety Policies for Schedule Planning in Industrial Construction Projects: A Case Study. In: Journal of Construction Engineering and Management, v. 149, n. 12 (Dezember 2023).
https://doi.org/10.1061/jcemd4.coeng-13690
-
Aghajamali, Kamyab / Nekouvaght Tak, Ala / Taghaddos, Hosein / Mousaei, Ali / Behzadipour, Saeed / Hermann, Ulrich (2023): Planning of Mobile Crane Walking Operations in Congested Industrial Construction Sites. In: Journal of Construction Engineering and Management, v. 149, n. 7 (Juli 2023).
https://doi.org/10.1061/jcemd4.coeng-13109
-
Azami, Ramtin / Lei, Zhen / Hermann, Ulrich / Zubick, Travis (2022): A Predictive Analytics Framework for Mobile Crane Configuration Selection in Heavy Industrial Construction Projects. In: Buildings, v. 12, n. 7 (5 Juli 2022).
https://doi.org/10.3390/buildings12070960
-
Mousaei, Ali / Taghaddos, Hosein / Bagheri, S. Marzieh / Hermann, Ulrich (2021): Optimizing Heavy Lift Plans for Industrial Construction Sites Using Dijkstra’s Algorithm. In: Journal of Construction Engineering and Management, v. 147, n. 11 (November 2021).
https://doi.org/10.1061/(asce)co.1943-7862.0002157
-
Wu, Lingzi / Ji, Wenying / Feng, Baoli / Hermann, Ulrich / AbouRizk, Simaan (2021): Intelligent data-driven approach for enhancing preliminary resource planning in industrial construction. In: Automation in Construction, v. 130 (Oktober 2021).
https://doi.org/10.1016/j.autcon.2021.103846
-
Nekouvaght Tak, Ala / Taghaddos, Hosein / Mousaei, Ali / Bolourani, Anahita / Hermann, Ulrich (2021): BIM-based 4D mobile crane simulation and onsite operation management. In: Automation in Construction, v. 128 (August 2021).
https://doi.org/10.1016/j.autcon.2021.103766
-
Mousaei, Ali / Taghaddos, Hosein / Nekouvaght Tak, Ala / Behzadipour, Saeed / Hermann, Ulrich (2021): Optimized Mobile Crane Path Planning in Discretized Polar Space. In: Journal of Construction Engineering and Management, v. 147, n. 5 (Mai 2021).
https://doi.org/10.1061/(asce)co.1943-7862.0002033
-
Taghaddos, Maedeh / Taghaddos, Hosein / Hermann, Ulrich / Mohamed, Yasser / AbouRizk, Simaan (2021): Hybrid multi-mode simulation and optimization for subarea scheduling in heavy industrial construction. In: Automation in Construction, v. 125 (Mai 2021).
https://doi.org/10.1016/j.autcon.2021.103616
-
Mohamed, Yasser / Borrego, Davila / Francisco, Luis / Al‐Hussein, Mohamed / AbouRizk, Simaan / Hermann, Ulrich (2007): Simulation‐based scheduling of module assembly yards: case study. In: Engineering, Construction and Architectural Management, v. 14, n. 3 (Mai 2007).
https://doi.org/10.1108/09699980710744926
-
Kayhani, Navid / Taghaddos, Hosein / Mousaei, Ali / Behzadipour, Saeed / Hermann, Ulrich (2021): Heavy mobile crane lift path planning in congested modular industrial plants using a robotics approach. In: Automation in Construction, v. 122 (Februar 2021).
https://doi.org/10.1016/j.autcon.2020.103508
-
Bagheri, S. Marzieh / Taghaddos, Hosein / Mousaei, Ali / Shahnavaz, Farid / Hermann, Ulrich (2021): An A-Star algorithm for semi-optimization of crane location and configuration in modular construction. In: Automation in Construction, v. 121 (Januar 2021).
https://doi.org/10.1016/j.autcon.2020.103447
-
Han, Sang Hyeok / Lei, Zhen / Hermann, Ulrich / Bouferguene, Ahmed / Al-Hussein, Mohamed (2021): 4D-based Automation of Heavy Lift Planning in Industrial Construction Projects. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 48, n. 9 (September 2021).
https://doi.org/10.1139/cjce-2019-0825
-
Shahnavaz, Farid / Taghaddos, Hosein / Najafabadi, Reza Sadeghi / Hermann, Ulrich (2020): Multi crane lift simulation using Building Information Modeling. In: Automation in Construction, v. 118 (Oktober 2020).
https://doi.org/10.1016/j.autcon.2020.103305
-
Taghaddos, Hosein / Hermann, Ulrich / AbouRizk, Simaan / Mohamed, Yasser (2014): Simulation-Based Multiagent Approach for Scheduling Modular Construction. In: Journal of Computing in Civil Engineering, v. 28, n. 2 (März 2014).
https://doi.org/10.1061/(asce)cp.1943-5487.0000262
-
Pereira, Estacio / Han, SangUk / AbouRizk, Simaan / Hermann, Ulrich (2017): Empirical Testing for Use of Safety Related Measures at the Organizational Level to Assess and Control the On-Site Risk Level. In: Journal of Construction Engineering and Management, v. 143, n. 6 (Juni 2017).
https://doi.org/10.1061/(asce)co.1943-7862.0001303
-
Pereira, Estacio / Hermann, Ulrich / Han, SangUk / AbouRizk, Simaan (2018): Case-Based Reasoning Approach for Assessing Safety Performance Using Safety-Related Measures. In: Journal of Construction Engineering and Management, v. 144, n. 9 (September 2018).
https://doi.org/10.1061/(asce)co.1943-7862.0001546
-
Lei, Zhen / Taghaddos, Hosein / Hermann, Ulrich / Al-Hussein, Mohamed (2013): A methodology for mobile crane lift path checking in heavy industrial projects. In: Automation in Construction, v. 31 (Mai 2013).
https://doi.org/10.1016/j.autcon.2012.11.042
-
Lei, Zhen / Taghaddos, Hosein / Olearczyk, Jacek / Al-Hussein, Mohamed / Hermann, Ulrich (2013): Automated Method for Checking Crane Paths for Heavy Lifts in Industrial Projects. In: Journal of Construction Engineering and Management, v. 139, n. 10 (Oktober 2013).
https://doi.org/10.1061/(asce)co.1943-7862.0000740
-
Lei, Zhen / Han, SangHyeok / Bouferguene, Ahmed / Taghaddos, Hosein / Hermann, Ulrich / Al-Hussein, Mohamed (2015): Algorithm for Mobile Crane Walking Path Planning in Congested Industrial Plants. In: Journal of Construction Engineering and Management, v. 141, n. 2 (Februar 2015).
https://doi.org/10.1061/(asce)co.1943-7862.0000929
-
Taghaddos, Hosein / Hermann, Ulrich / Abbasi, ArioBarzan (2018): Automated Crane Planning and Optimization for modular construction. In: Automation in Construction, v. 95 (November 2018).
https://doi.org/10.1016/j.autcon.2018.07.009
-
Lei, Zhen / Taghaddos, Hosein / Han, SangHyeok / Bouferguene, Ahmed / Al-Hussein, Mohamed / Hermann, Ulrich (2015): From AutoCAD to 3ds Max: An automated approach for animating heavy lifting studies. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 42, n. 3 (März 2015).
https://doi.org/10.1139/cjce-2014-0313