Ding Hao
- Displacement Response of Submerged Floating Tunnel Tube Due to Single Moving Load. In: Procedia Engineering, v. 166 ( 2016). (2016):
- Enlightenment to Floating Tunnel of Existing Typical Submerged Tunnel. In: Procedia Engineering, v. 166 ( 2016). (2016):
- Theoretical and experimental studies on critical time delay of multi-DOF real-time hybrid simulation. In: Earthquake Engineering and Engineering Vibration, v. 21, n. 1 (Oktober 2021). (2021):