-
Hansen, Brett (2010): Defying The Odds: The Stone Arch Bridge. In: Civil Engineering Magazine, v. 80, n. 12 (Dezember 2010).
https://doi.org/10.1061/ciegag.0000545
-
Hansen, Brett (2010): Merging Form With Function: The Arroyo Seco Parkway. In: Civil Engineering Magazine, v. 80, n. 11 (November 2010).
https://doi.org/10.1061/ciegag.0000544
-
Hansen, Brett (2010): Linking the Lakes: The Lake Washington Ship Canal. In: Civil Engineering Magazine, v. 80, n. 10 (Oktober 2010).
https://doi.org/10.1061/ciegag.0000543
-
Hansen, Brett (2010): Establishing the Legacy: West Point and the United States Military Academy. In: Civil Engineering Magazine, v. 80, n. 8 (August 2010).
https://doi.org/10.1061/ciegag.0000541
-
Hansen, Brett (2010): Establishing the Legacy: West Point and the United States Military Academy. In: Civil Engineering Magazine, v. 80, n. 7 (Juli 2010).
https://doi.org/10.1061/ciegag.0000540
-
Hansen, Brett (2010): Empowering the People: The Bonneville Dam. In: Civil Engineering Magazine, v. 80, n. 6 (Juni 2010).
https://doi.org/10.1061/ciegag.0000539
-
Hansen, Brett (2010): Bogged Down: The Dismal Swamp Canal. In: Civil Engineering Magazine, v. 80, n. 5 (Mai 2010).
https://doi.org/10.1061/ciegag.0000538
-
Hansen, Brett (2010): Completing the Loop: The Tehachapi Pass Railroad. In: Civil Engineering Magazine, v. 80, n. 4 (April 2010).
https://doi.org/10.1061/ciegag.0000537
-
Hansen, Brett (2010): The Hudson and Manhattan Railroad Tunnels: Digging Under Pressure. In: Civil Engineering Magazine, v. 80, n. 1 (Januar 2010).
https://doi.org/10.1061/ciegag.0000534
-
Hansen, Brett (2009): The Elephant Butte Dam: Keeping the Peace. In: Civil Engineering Magazine, v. 79, n. 10 (Oktober 2009).
https://doi.org/10.1061/ciegag.0000531
-
Hansen, Brett (2009): Moving the Massachusetts Masses: Boston's Subway. In: Civil Engineering Magazine, v. 79, n. 9 (September 2009).
https://doi.org/10.1061/ciegag.0000530
-
Hansen, Brett (2009): Assembling the Cast: The Dunlap's Creek Bridge. In: Civil Engineering Magazine, v. 79, n. 6 (Juni 2009).
https://doi.org/10.1061/ciegag.0000527
-
Hansen, Brett (2009): Following the Curve: The Cheesman Dam. In: Civil Engineering Magazine, v. 79, n. 5 (Mai 2009).
https://doi.org/10.1061/ciegag.0000526
-
Hansen, Brett (2009): Gearing Up: The Mount Washington Cog Railway. In: Civil Engineering Magazine, v. 79, n. 4 (April 2009).
https://doi.org/10.1061/ciegag.0000525
-
Hansen, Brett (2007): Quenching Chicago's Thirst: The Waterworks of Ellis S. Chesbrough. In: Civil Engineering Magazine, v. 77, n. 11 (November 2007).
https://doi.org/10.1061/ciegag.0000804
-
Hansen, Brett (2007): Breaking the Mold: The Kentucky River High Bridge. In: Civil Engineering Magazine, v. 77, n. 9 (September 2007).
https://doi.org/10.1061/ciegag.0000802
-
Hansen, Brett (2007): Bypassing the Peninsula: The Chesapeake and Delaware Canal. In: Civil Engineering Magazine, v. 77, n. 8 (August 2007).
https://doi.org/10.1061/ciegag.0000801
-
Hansen, Brett (2007): Enlightening the World: The Statue of Liberty. In: Civil Engineering Magazine, v. 77, n. 7 (Juli 2007).
https://doi.org/10.1061/ciegag.0000800
-
Hansen, Brett (2007): Probing for Passage: The St. Clair Tunnel. In: Civil Engineering Magazine, v. 77, n. 5 (Mai 2007).
https://doi.org/10.1061/ciegag.0000798
-
Hansen, Brett (2007): Bridling the Potomac: The Washington Aqueduct. In: Civil Engineering Magazine, v. 77, n. 1 (Januar 2007).
https://doi.org/10.1061/ciegag.0000794
-
Hansen, Brett (2008): Conquering the Arizona Desert: The Theodore Roosevelt Dam. In: Civil Engineering Magazine, v. 78, n. 8 (August 2008).
https://doi.org/10.1061/ciegag.0000813
-
Hansen, Brett (2008): Orchestrating the Obelisk: The Washington Monument. In: Civil Engineering Magazine, v. 78, n. 7 (Juli 2008).
https://doi.org/10.1061/ciegag.0000812
-
Hansen, Brett (2008): Climbing the Mountain: The Allegheny Portage Railroad. In: Civil Engineering Magazine, v. 78, n. 1 (Januar 2008).
https://doi.org/10.1061/ciegag.0000806
-
Hansen, Brett (2008): Breaking the Ice: The New Castle Ice Harbor. In: Civil Engineering Magazine, v. 78, n. 2 (Februar 2008).
https://doi.org/10.1061/ciegag.0000807
-
Hansen, Brett (2008): Delivering the Mail: The Kamehameha V Post Office. In: Civil Engineering Magazine, v. 78, n. 3 (März 2008).
https://doi.org/10.1061/ciegag.0000808
-
Hansen, Brett (2008): Going for the Gold: The White Pass and Yukon Route. In: Civil Engineering Magazine, v. 78, n. 11 (November 2008).
https://doi.org/10.1061/ciegag.0000520
-
Hansen, Brett (2005): New Concrete Can Monitor Itself. In: Civil Engineering Magazine, v. 75, n. 11 (November 2005).
https://doi.org/10.1061/ciegag.0000886
-
Hansen, Brett (2010): Crowning the Queen of the West: The John A. Roebling Suspension Bridge. In: Civil Engineering Magazine, v. 80, n. 9 (September 2010).
https://doi.org/10.1061/ciegag.0000542
-
Hansen, Brett (2010): Crossing Lines: The Wheeling Suspension Bridge. In: Civil Engineering Magazine, v. 80, n. 2 (Februar 2010).
https://doi.org/10.1061/ciegag.0000535
-
Hansen, Brett (2007): Gathering Strength. In: Civil Engineering Magazine, v. 77, n. 8 (August 2007).
https://doi.org/10.1061/ciegag.0000134