-
Ngov, Kheang / Ko, Yongho / Noh, Jaeyun / Lee, Sumin / Han, Seungwoo: Fleet management for earthmoving operation in the phase of detail estimation using mixed integer nonlinear programming. In: Journal of Asian Architecture and Building Engineering.
https://doi.org/10.1080/13467581.2024.2320321
-
Kim, Hyun-Mi / Kim, Tae-Hyung / Shin, Young-Keun / Kim, Young-Suk / Han, Seungwoo (2012): Quantified Impact Analysis of Construction Delay Factors on Steel Staircase Systems. In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 12, n. 6 (Dezember 2012).
https://doi.org/10.5345/jkibc.2012.12.6.636
-
Ko, Yongho / Kim, Yujin / Noh, Jaeyun / Lee, Kanghyeok / Shin, Dohyoung / Han, Seungwoo (2023): Methodology for construction-standard-production-rate-based simulation modeling and production-rate data generation. In: Journal of Asian Architecture and Building Engineering, v. 23, n. 2 (Dezember 2023).
https://doi.org/10.1080/13467581.2023.2278885
-
Kim, Sungchul / Kong, Minjin / Choi, Jinwoo / Han, Seungwoo / Baek, Hoyoung / Hong, Taehoon (2021): Feasibility Analysis of COVID-19 Response Guidelines at Construction Sites in South Korea Using CYCLONE in Terms of Cost and Time. In: Journal of Management in Engineering (ASCE), v. 37, n. 5 (September 2021).
https://doi.org/10.1061/(asce)me.1943-5479.0000957
-
Kim, Gwangho / Hong, Taehoon / Han, Seungwoo / Lee, Sangyoub (2011): Analysis of Development Cost Based on Planning Characteristics of Multifamily Housing Development Projects. In: Journal of Urban Planning and Development, v. 137, n. 3 (September 2011).
https://doi.org/10.1061/(asce)up.1943-5444.0000061
-
Ji, Changyoon / Hong, Taehoon / Jeong, Kwangbok / Kim, Jimin / Koo, ChoongWan / Lee, Minhyun / Han, Seungwoo / Kang, Youngcheol (2020): Embodied and Operational CO2 Emissions of the Elementary School Buildings in Different Climate Zones. In: KSCE Journal of Civil Engineering, v. 24, n. 4 (März 2020).
https://doi.org/10.1007/s12205-020-2321-2
-
Han, Seungwoo / Ko, Yongho / Kim, Jimin / Hong, Taehoon (2018): Housing Market Trend Forecasts through Statistical Comparisons based on Big Data Analytic Methods. In: Journal of Management in Engineering (ASCE), v. 34, n. 2 (März 2018).
https://doi.org/10.1061/(asce)me.1943-5479.0000583
-
Han, Seungwoo / Ko, Yong-Ho / Hong, Taehoon / Koo, ChoongWan / Lee, Sangyoub (2017): Framework for the validation of simulation-based productivity analysis: focused on curtain wall construction process. In: Journal of Civil Engineering and Management, v. 23, n. 2 (Februar 2017).
https://doi.org/10.3846/13923730.2014.992468
-
Han, Seungwoo / Hong, Taehoon / Kim, Gwangho / Lee, Sangyoub (2011): Technical Comparisons of Simulation-Based Productivity Prediction Methodologies By Means of Estimation Tools Focusing on Conventional Earthmovings/ Imitacinių produktyvumo prognozavimo metodikųtechninis palyginimas, pasitelkus vertinimo priemones, akcent. In: Journal of Civil Engineering and Management, v. 17, n. 2 (Juli 2011).
https://doi.org/10.3846/13923730.2011.574381
-
Ko, Yongho / Han, Seungwoo (2015): Development of Construction Performance Monitoring Methodology using the Bayesian Probabilistic Approach. In: Journal of Asian Architecture and Building Engineering, v. 14, n. 1 (Januar 2015).
https://doi.org/10.3130/jaabe.14.73
-
Han, Seungwoo / Lee, Taehee / Ko, Yongho (2014): Implementation of Construction Performance Database Prototype for Curtain Wall Operation in High-Rise Building Construction. In: Journal of Asian Architecture and Building Engineering, v. 13, n. 1 (Januar 2014).
https://doi.org/10.3130/jaabe.13.149
-
Lee, Kyung-Suk / Kim, Hyun-Mi / Lee, Tae-Hee / Han, Seungwoo (2012): A Selection Methodology of Slab-form Construction Methods in Residential Buildings based on the Simulation and Delphi Techniques. In: Journal of Asian Architecture and Building Engineering, v. 11, n. 1 (Mai 2012).
https://doi.org/10.3130/jaabe.11.39
-
Han, Seungwoo (2010): Productivity Analysis Comparison of Different Types of Earthmoving Operations by Means of Various Productivity Measurements. In: Journal of Asian Architecture and Building Engineering, v. 9, n. 1 (Mai 2010).
https://doi.org/10.3130/jaabe.9.185
-
Han, Seungwoo / Lee, Seunghyun (2008): Quantified Comparison and Analysis of Different Productivity Measurements. In: Journal of Asian Architecture and Building Engineering, v. 7, n. 2 (November 2008).
https://doi.org/10.3130/jaabe.7.309
-
Han, Seungwoo / Kim, Youngsuk / Jeong, Seunghoon / Choi, Jongsoo / Woo, Sungkwon (2014): Simulation technique-based sensitivity analysis on staircase construction process in high-rise building construction. In: KSCE Journal of Civil Engineering, v. 18, n. 2 (Januar 2014).
https://doi.org/10.1007/s12205-014-0383-8
-
Han, Seungwoo / Ko, Yongho / Kim, Seongdo / Shin, Do Hyoung (2016): Home sales index prediction model based on cluster and principal component statistical approaches in a big data analytic concept. In: KSCE Journal of Civil Engineering, v. 21, n. 1 (Mai 2016).
https://doi.org/10.1007/s12205-016-0574-6
-
Han, Seungwoo / Ko, Yongho / Kim, Jung-Yeol / Shin, Do Hyoung (2017): Enhancement of Prediction Accuracy for Home Sales Index Prediction Model based on Integration of Multiple Regression Analysis and Genetic Algorithm. In: KSCE Journal of Civil Engineering, v. 22, n. 7 (August 2017).
https://doi.org/10.1007/s12205-017-1648-9
-
Hong, Taehoon / Cho, Kyuman / Hyun, Changtaek / Han, Seungwoo (2011): Simulation-Based Schedule Estimation Model for ACS-Based Core Wall Construction of High-Rise Building. In: Journal of Construction Engineering and Management, v. 137, n. 6 (Juni 2011).
https://doi.org/10.1061/(asce)co.1943-7862.0000300
-
Hong, Taehoon / Han, Seungwoo / Lee, Sangyoub (2007): Simulation-based determination of optimal life-cycle cost for FRP bridge deck panels. In: Automation in Construction, v. 16, n. 2 (März 2007).
https://doi.org/10.1016/j.autcon.2006.01.001
-
Han, Seungwoo / Lee, Sangyoub / Hong, Taehoon / Chang, Hoon (2006): Simulation analysis of productivity variation by global positioning system (GPS) implementation in earthmoving operations. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 33, n. 9 (September 2006).
https://doi.org/10.1139/l05-124
-
Kim, Jungwuk / Lee, Sangyoub / Hong, Taehoon / Han, Seungwoo (2006): Activity vulnerability index for delay risk forecasting. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 33, n. 10 (Oktober 2006).
https://doi.org/10.1139/l06-075
-
Han, Seungwoo / Hong, Taehoon / Lee, Sangyoub (2008): Production prediction of conventional and global positioning system–based earthmoving systems using simulation and multiple regression analysis. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 35, n. 6 (Juni 2008).
https://doi.org/10.1139/l08-005