- Linear Scheduling Method-Based Multi-Objective Optimization for Off-Site Construction Manufacturing. In: Automation in Construction, v. 167 (November 2024). (2024):
- 3D ergonomics-based motion-level productivity analysis for intelligent manufacturing in industrialized construction. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 50, n. 3 (1 März 2023). (2023):
- Sources of Ambiguity in Construction Contract Documents, Reflected by Litigation in Supreme Court Cases. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 13, n. 4 (November 2021). (2021):
- 4D-based Automation of Heavy Lift Planning in Industrial Construction Projects. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 48, n. 9 (September 2021). (2021):
- Utilization of 3D Visualization of Mobile Crane Operations for Modular Construction On-Site Assembly. In: Journal of Management in Engineering (ASCE), v. 31, n. 5 (September 2015). (2015):
- Automated post-simulation visualization of modular building production assembly line. In: Automation in Construction, v. 21 (Januar 2012). (2012):