Ahmed Hammad
- Mathematical optimisation of location and design of windows by considering energy performance, lighting and privacy of buildings. In: Smart and Sustainable Built Environment, v. 8, n. 2 (Mai 2019). (2019):
- An experimental investigation of the mechanical characteristics and drying shrinkage of a single-size expanded polystyrene lightweight concrete reinforced with waste plastic fibres. In: Construction and Building Materials, v. 415 (Februar 2024). (2024):
- Decision support system for selecting engineering consultants using Qualifications-Based Selection (QBS) and fuzzy TOPSIS. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 50, n. 10 (1 Oktober 2023). (2023):
- (2021): Application of Fuzzy-TOPSIS Method in Supporting Supplier Selection with Focus on HSE Criteria: A Case Study in the Oil and Gas Industry. In: Infrastructures, v. 6, n. 8 (August 2021).
- Estimating labor resource requirements in construction projects using machine learning. In: Construction Innovation, v. 24, n. 4 (August 2023). (2023):
- (2022): Construction project delivery: Practices, challenges, and opportunities. In: Frontiers in Built Environment, v. 8 (Februar 2022).
- Impact Of Architect/engineer (a/e) Consultant Qualifications On Project Outcomes. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 49, n. 12 (1 Dezember 2022). (2022):
- Mixed qualitative–quantitative approach for bidding decisions in construction. In: Engineering, Construction and Architectural Management, v. 29, n. 6 (Juni 2021). (2021):
- Comparative Modeling Approach to Capture the Differences in BIM Adoption Decision-Making Process in Australia and China. In: Journal of Construction Engineering and Management, v. 146, n. 2 (Februar 2020). (2020):
- Application of KDD Techniques to Extract Useful Knowledge from Labor Resources Data in Industrial Construction Projects. In: Journal of Management in Engineering (ASCE), v. 30, n. 6 (November 2014). (2014):