Said Abdel Hamid
- A model for prioritizing concrete structures repair works. In: HBRC Journal, v. 14, n. 3 (Dezember 2018). (2018):
- Budget allocation for water mains rehabilitation projects using Simos' procedure. In: HBRC Journal, v. 13, n. 1 (April 2017). (2017):
- A methodology for prioritizing water mains rehabilitation in Egypt. In: HBRC Journal, v. 11, n. 1 (April 2015). (2015):