- (2024): Collaborative BIM-Based Construction Coordination Progress Modeling Using Extended Collaborative Process Modeling (exCPM). In: Buildings, v. 14, n. 2 (1 Februar 2024).
- 주한미군공사 수행을 위한 FED(Far East District) 프로세스 분석에 관한 연구 (Analysis of the Construction Process Managed by the U.S. Army Corps of Engineers Far East District Using IDEF0). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 10, n. 1 (Februar 2010). (2010):
- (2023): Performance Analysis and Assessment of BIM-Based Construction Support with Priority Queuing Policy. In: Buildings, v. 13, n. 1 (13 Januar 2023).
- Impacts of Macroeconomic Fluctuations on Insolvency: Case of Korean Construction Companies. In: Journal of Management in Engineering (ASCE), v. 30, n. 5 (September 2014). (2014):
- (2019): BIM-Based Digital Fabrication Process for a Free-Form Building Project in South Korea. In: Advances in Civil Engineering, v. 2019 ( 2019).