D. Hall
- Tees Barrage. Part 1. Planning.. In: Proceedings of the Institution of Civil Engineers - Municipal Engineer, v. 109, n. 3 (September 1995). (1995):
- Tees Barrage. Part 6. Operation of The Barrage and Management of The Upstream River.. In: Proceedings of the Institution of Civil Engineers - Municipal Engineer, v. 109, n. 3 (September 1995). (1995):
- Historical Perspective on Horizontally Curved I Girder Bridge Design in the United States. In: Journal of Bridge Engineering (ASCE), v. 9, n. 3 (Mai 2004). (2004):