Sebastian Grüllich
- 15 km TBM exploratory tunnel excavation in the construction Lot H33 of the Brenner Base Tunnel. In: Geomechanics and Tunnelling, v. 12, n. 5 (Oktober 2019). (2019):
- Analyses of TBM disc cutter forces – application possibilities. In: Geomechanics and Tunnelling, v. 12, n. 5 (Oktober 2019). (2019):
- Brenner Base Tunnel exploratory tunnel Ahrental‐Pfons – interaction between tunnel boring machine and rock mass as well as measures to manage fault zones. In: Geomechanics and Tunnelling, v. 12, n. 5 (Oktober 2019). (2019):