P. Green
- Ecological footprint analysis as a project assessment tool. In: Proceedings of the Institution of Civil Engineers - Engineering Sustainability, v. 156, n. 3 (September 2003). (2003):
- Form travelers cast bridge on six-day cycle. In: Engineering News Record (7 Januar 1988). (1988):