Ma. C. González-Cruz
- Duration and Cost Variability of Construction Activities: An Empirical Study. In: Journal of Construction Engineering and Management, v. 146, n. 1 (Januar 2020). (2020):
- The iso-Score Curve Graph. A new tool for competitive bidding. In: Automation in Construction, v. 22 (März 2012). (2012):