- (2023): An Integrated Model for Multi-Mode Resource-Constrained Multi-Project Scheduling Problems Considering Supply Management with Sustainable Approach in the Construction Industry under Uncertainty Using Evidence Theory and Optimization Algorithms. In: Buildings, v. 13, n. 8 (2 August 2023).
- Waste glass as a precursor in alkali‐activated materials: Mechanical, durability, and microstructural properties. In: Structural Concrete, v. 23, n. 6 (Dezember 2021). (2021):