Hamza Farooq Gabriel
- Managing risk in green building projects: toward a dedicated framework. In: Smart and Sustainable Built Environment, v. 9, n. 2 (Dezember 2019). (2019):
- Empirical Evidence of Extension of Time in Construction Projects. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 9, n. 3 (August 2017). (2017):
- Causes of Discrepancies between Design and Construction in the Pakistan Construction Industry. In: Journal of Construction in Developing Countries, v. 22, n. 2 ( 2018). (2018):
- Quantification of Material Wastage in Construction Industry of Pakistan: An Analytical Relationship between Building Types and Waste Generation. In: Journal of Construction in Developing Countries, v. 22, n. 2 ( 2018). (2018):
- Critical External Risks in International Joint Ventures for Construction Industry in Pakistan. In: International Journal of Civil Engineering, v. 16, n. 2 (Januar 2018). (2018):
- Supercritical flow simulation at a right channel junction. Comparison between a uniform and a sparse mesh. In: KSCE Journal of Civil Engineering, v. 21, n. 7 (Mai 2017). (2017):
- (2015): Seismic Vulnerability Assessment of Deficient RC Structures with Bar Pullout and Joint Shear Degradation. In: Advances in Civil Engineering, v. 2015 ( 2015).