John Finke
- Construction of Seismic Retrofit Strategies of the US 40/I-64 Double Deck Bridge Complex. Vorgetragen bei: Structures Congress 2006, May 18-21, 2006, St. Louis, Missouri, United States. (2006):
- Structures Congress 2006. American Society of Civil Engineers (ASCE), Reston (USA). (2006):
- (2014): Challenging Design Aspects of a 3-Tower Cable-Stayed Bridge. Vorgetragen bei: IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014.
- (2017): Constructing the Abraham Lincoln Bridge. Vorgetragen bei: IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017.