Siri Fernando
- Simulation modeling and sensitivity analysis of a tunneling construction project's supply chain. In: Engineering, Construction and Architectural Management, v. 18, n. 5 (September 2011). (2011):
- Automated Real-Time Monitoring System to Measure Shift Production of Tunnel Construction Projects. In: Journal of Computing in Civil Engineering, v. 27, n. 1 (Januar 2013). (2013):
- Special purpose simulation templates for tunnel construction operations. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 28, n. 2 (April 2001). (2001):
- Special purpose simulation templates for tunnel construction operations. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 28, n. 2 (April 2001). (2001):
- Application of lean thinking to improve the productivity of water and sewer service installations. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 35, n. 4 (April 2008). (2008):
- Artificial Neural Network Model for Cost Estimation: City of Edmonton's Water and Sewer Installation Services. In: Journal of Construction Engineering and Management, v. 136, n. 7 (Juli 2010). (2010):