- Integrated Planning Approach for Optimizing Tower Crane and Truck Locations in Modular Integrated Construction. In: Journal of Construction Engineering and Management, v. 150, n. 9 (September 2024). (2024):
- Systematic and scientometric analyses of predictors for modelling water pipes deterioration. In: Automation in Construction, v. 149 (Mai 2023). (2023):
- Optimized multimodal logistics planning of modular integrated construction using hybrid multi-agent and metamodeling. In: Automation in Construction, v. 145 (Januar 2023). (2023):
- Sustainable Logistics Planning in Modular Integrated Construction Using Multimethod Simulation and Taguchi Approach. In: Journal of Construction Engineering and Management, v. 148, n. 6 (Juni 2022). (2022):