Philip Eames
- Energy simulations of a transparent‐insulated office façade retrofit in London, UK. In: Smart and Sustainable Built Environment, v. 1, n. 3 (November 2012). (2012):
- Current and future operation scenarios for a 50,000 MWh district heating system. In: Architectural Engineering and Design Management, v. 11, n. 4 (Juni 2014). (2014):