J. F. Dong
- High temperature behaviour of basalt fibre-steel tube reinforced concrete columns with recycled aggregates under monotonous and fatigue loading. In: Construction and Building Materials, v. 389 (Juli 2023). (2023):
- Freeze-thaw behaviour of basalt fibre reinforced recycled aggregate concrete filled CFRP tube specimens. In: Engineering Structures, v. 273 (Dezember 2022). (2022):
- Developing a three-dimensional finite element analysis approach to simulate corrosion-induced concrete cracking in reinforced concrete beams. In: Engineering Structures, v. 257 (April 2022). (2022):
- High-temperature behaviour of basalt fibre reinforced concrete made with recycled aggregates from earthquake waste. In: Journal of Building Engineering, v. 48 (Mai 2022). (2022):
- Prediction of corrosion-induced concrete cracking under external loading and stirrup constraint. In: Construction and Building Materials, v. 266 (Januar 2021). (2021):
- Experimental Study and Analytical Model of Concrete Cover Spalling Induced by Steel Corrosion. In: Journal of Structural Engineering (ASCE), v. 146, n. 6 (Juni 2020). (2020):
- Material properties of basalt fibre reinforced concrete made with recycled earthquake waste. In: Construction and Building Materials, v. 130 (Januar 2017). (2017):
- Structural behaviour of recycled aggregate concrete filled steel tube columns strengthened by CFRP. In: Engineering Structures, v. 48 (März 2013). (2013):
- Structural behaviour of RC beams externally strengthened with FRP sheets under fatigue and monotonic loading. In: Engineering Structures, v. 41 (August 2012). (2012):