Abhijeet S. Deshpande
- Lean Techniques in the Management of the Design of an Industrial Project. In: Journal of Management in Engineering (ASCE), v. 28, n. 2 (April 2012). (2012):
- Analysis of the Higher-Order Partial Correlation between CII Best Practices and Performance of the Design Phase in Fast-Track Industrial Projects. In: Journal of Construction Engineering and Management, v. 138, n. 6 (Juni 2012). (2012):