Reza Dehghan
- Quantitative Risk-Analysis Process of Oil and Gas Upstream Service Contracts. In: Practice Periodical on Structural Design and Construction, v. 27, n. 2 (Mai 2022). (2022):
- A Heuristic Approach to Forecasting the Delivery Time of Major Project Deliverables. In: Practice Periodical on Structural Design and Construction, v. 25, n. 2 (Mai 2020). (2020):
- Optimization of overlapping activities in the design phase of construction projects. In: Automation in Construction, v. 59 (November 2015). (2015):
- Model of Trade-Off between Overlapping and Rework of Design Activities. In: Journal of Construction Engineering and Management, v. 140, n. 2 (Februar 2014). (2014):
- An evolutionary optimization method to determine optimum degree of activity accelerating and overlapping in schedule compression. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 41, n. 4 (April 2014). (2014):
- A heuristic method to determine optimum degree of activity accelerating and overlapping in schedule compression. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 40, n. 4 (April 2013). (2013):