Prabir K. Das
- Use of Soldier Pile–Tremie Concrete Slurry Walls as Permanent Tunnel Walls. In: Transportation Research Record: Journal of the Transportation Research Board, v. 1541, n. 1 (Januar 1996). (1996):
- Challenges of No. 7 Subway Line Extension Project's TBM Shaft Design. Vorgetragen bei: Structures Congress 2006, May 18-21, 2006, St. Louis, Missouri, United States. (2006):
- Laboratory investigation of bitumen based on round robin DSC and AFM tests. In: Materials and Structures, v. 47, n. 7 (Juli 2014). (2014):
- Underpinning of Red Line South Station. Vorgetragen bei: IABSE Colloquium: Tunnel structures, Stockholm, Sweden, June 1998. (1998):
- Challenging use of immersed tubes in the Fort Point Channel, Boston. Vorgetragen bei: IABSE Colloquium: Tunnel structures, Stockholm, Sweden, June 1998. (1998):
- Deep soil-cement mixing for CA/T project. Vorgetragen bei: IABSE Colloquium: Tunnel structures, Stockholm, Sweden, June 1998. (1998):
- Soldier pile tremie concrete walls as part of the final tunnel structure. Vorgetragen bei: IABSE Colloquium: Tunnel structures, Stockholm, Sweden, June 1998. (1998):