Peter Curran
- Acceptance of cable systems using prestressing steels. fédération internationale du béton (fib), Lausanne (Schweiz), ISBN 9782883941304. (2019):
- Gateshead Millenium Bridge. In: TEC21, v. 130, n. 8 (20 Februar 2004). (2004):
- Mumbai Trans Harbour Link. Project Overview of Package 2. In: Brückenbau, v. 12, n. 1-2 ( 2020). (2020):
- El puente Queensferry Crossing. Desarrollo del diseño ganador. Vorgetragen bei: VII Congreso Internacional de Estructuras, Congreso de la Asociación Científico-Técnica del Hormigón Estructural (ACHE), A Coruña, 20-22 de junio de 2017. (2017):
- Queensferry Crossing – Cable Stayed Bridge Deck and Cables – Design and Construction. In: Proceedings of the Institution of Civil Engineers - Bridge Engineering, v. 172, n. 2 (Juni 2019). (2019):
- MediaCityUK Footbridge, Salford, UK. In: Proceedings of the Institution of Civil Engineers - Bridge Engineering, v. 168, n. 2 (Juni 2015). (2015):
- (2014): Queensferry Crossing: Design development through construction. Vorgetragen bei: IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014.
- The Process of Creativity and Collaboration in the Design of Landmark Bridges. Vorgetragen bei: IABSE Conference: Creativity and Collaboration – Instilling Imagination and Innovation in Structural Design, Bath, United Kingdom, 19-20 April 2017. (2017):
- Gateshead Millennium Bridge—an eye-opener for engineering. In: Proceedings of the Institution of Civil Engineers - Civil Engineering, v. 156, n. 1 (Februar 2003). (2003):
- Bridging an urban renaissance. Vorgetragen bei: Footbridge 2005 (Second International Congress), Venezia, 06-08 December 2005. (2005):
- Forthside Bridge, Stirling, Scotland. Vorgetragen bei: Footbridge 2008 - Footbridges for Urban Renewal, Third International Conference on Footbridges, 2-4 July 2008, Porto, Portugal. (2008):
- (2016): Challenges in the Design and Construction of the Queensferry Crossing. Vorgetragen bei: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016.
- Media City Footbridge, Salford Quays. Vorgetragen bei: 4th International Conference Footbridge 2011, Wroclaw, Poland, 6-8 July 2011. (2011):
- Media City Footbridge, Salford, UK. Vorgetragen bei: 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011. (2011):
- Forth Replacement Crossing - Tender Design. Vorgetragen bei: 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011. (2011):
- (2010): Media City Footbridge, Salford Quays. Vorgetragen bei: IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010.
- Gateshead Millennium Bridge, UK. In: Structural Engineering International, v. 13, n. 4 (November 2003). (2003):
- Design and Monitoring of the Flintshire Bridge, UK. In: Structural Engineering International, v. 9, n. 3 (August 1999). (1999):