John Christian
- Impact of Quality on Building Costs. In: Journal of Infrastructure Systems, v. 12, n. 4 (Dezember 2006). (2006):
- Cost Predictions of Facilities. In: Journal of Management in Engineering (ASCE), v. 13, n. 1 (Januar 1997). (1997):
- The use of expert systems and sensitivity analyses in formwork productivity and design. In: Computers & Structures, v. 30, n. 3 (Januar 1988). (1988):
- Use of Integrated Microcomputer Package for Formwork Design. In: Journal of Construction Engineering and Management, v. 113, n. 4 (Dezember 1987). (1987):
- Hypertext and Claim Analysis. In: Journal of Construction Engineering and Management, v. 118, n. 4 (Dezember 1992). (1992):
- Effects of Delay Times on Production Rates in Construction. In: Journal of Construction Engineering and Management, v. 121, n. 1 (März 1995). (1995):
- Highway construction and maintenance costs. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 26, n. 4 (August 1999). (1999):
- An expert system for predicting the cost – time profiles of building activities. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 18, n. 5 (Oktober 1991). (1991):
- Improving earthmoving estimating by more realistic knowledge. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 23, n. 1 (Februar 1996). (1996):
- Earthmoving cost optimization by operational research. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 15, n. 4 (August 1988). (1988):