Lai Kit Chow
- A fuzzy gap analysis model for evaluating the performance of engineering consultants. In: Automation in Construction, v. 16, n. 4 (Juli 2007). (2007):
- Delineating the performance standards of engineering consultants at design stage. In: Construction Management and Economics, v. 28, n. 1 (Januar 2010). (2010):