-
Liu, Yuhan / Tao, Xingyu / Das, Moumita / Gong, Xingbo / Liu, Hao / Xu, Yuqing / Xie, Anke / Cheng, Jack C. P. (2024): Blockchain-enabled platform-as-a-service for production management in off-site construction design using openBIM standards. In: Automation in Construction, v. 164 (August 2024).
https://doi.org/10.1016/j.autcon.2024.105447
-
Jiang, Feifeng / Ma, Jun / Webster, Christopher John / Wang, Wei / Cheng, Jack C. P. (2024): Automated site planning using CAIN-GAN model. In: Automation in Construction, v. 159 (März 2024).
https://doi.org/10.1016/j.autcon.2024.105286
-
Lao, Weng-Lam / Li, Mingkai / Wong, Billy C. L. / Gan, Vincent J. L. / Cheng, Jack C. P. (2023): BIM-based constructability-aware precast building optimization using optimality criteria and combined non-dominated sorting genetic II and great deluge algorithm (NSGA-II-GD). In: Automation in Construction, v. 155 (November 2023).
https://doi.org/10.1016/j.autcon.2023.105065
-
Li, Mingkai / Liu, Yuhan / Wong, Billy C. L. / Gan, Vincent J. L. / Cheng, Jack C. P. (2023): Automated structural design optimization of steel reinforcement using graph neural network and exploratory genetic algorithms. In: Automation in Construction, v. 146 (Februar 2023).
https://doi.org/10.1016/j.autcon.2022.104677
-
Song, Changhao / Chen, Zhengyi / Wang, Kai / Luo, Han / Cheng, Jack C. P. (2022): BIM-supported scan and flight planning for fully autonomous LiDAR-carrying UAVs. In: Automation in Construction, v. 142 (Oktober 2022).
https://doi.org/10.1016/j.autcon.2022.104533
-
Yin, Chao / Cheng, Jack C. P. / Wang, Boyu / Gan, Vincent J. L. (2022): Automated classification of piping components from 3D LiDAR point clouds using SE-PseudoGrid. In: Automation in Construction, v. 139 (Juli 2022).
https://doi.org/10.1016/j.autcon.2022.104300
-
Abner, Michael / Wong, Peter Kok-Yiu / Cheng, Jack C. P. (2022): Battery lifespan enhancement strategies for edge computing-enabled wireless Bluetooth mesh sensor network for structural health monitoring. In: Automation in Construction, v. 140 (August 2022).
https://doi.org/10.1016/j.autcon.2022.104355
-
Cheng, Jack C. P. / Kwok, Helen H. L. / Li, Alison T. Y. / Tong, Jimmy C. K. / Lau, Alexis K. H. (2022): BIM-supported sensor placement optimization based on genetic algorithm for multi-zone thermal comfort and IAQ monitoring. In: Building and Environment, v. 216 (Mai 2022).
https://doi.org/10.1016/j.buildenv.2022.108997
-
Zhang, Jiaying / Kwok, Helen H. L. / Luo, Han / Tong, Jimmy C. K. / Cheng, Jack C. P. (2022): Automatic relative humidity optimization in underground heritage sites through ventilation system based on digital twins. In: Building and Environment, v. 216 (Mai 2022).
https://doi.org/10.1016/j.buildenv.2022.108999
-
Tao, Xingyu / Liu, Yuhan / Wong, Peter Kok-Yiu / Chen, Keyu / Das, Moumita / Cheng, Jack C. P. (2022): Confidentiality-minded framework for blockchain-based BIM design collaboration. In: Automation in Construction, v. 136 (April 2022).
https://doi.org/10.1016/j.autcon.2022.104172
-
Das, Moumita / Tao, Xingyu / Liu, Yuhan / Cheng, Jack C. P. (2022): A blockchain-based integrated document management framework for construction applications. In: Automation in Construction, v. 133 (Januar 2022).
https://doi.org/10.1016/j.autcon.2021.104001
-
Singh, Jyoti / Cheng, Jack C. P. / Anumba, Chimay J. (2021): BIM-Based Approach for Automatic Pipe Systems Installation Coordination and Schedule Optimization. In: Journal of Construction Engineering and Management, v. 147, n. 11 (November 2021).
https://doi.org/10.1061/(asce)co.1943-7862.0002077
-
Yin, Chao / Wang, Boyu / Gan, Vincent J. L. / Wang, Mingzhu / Cheng, Jack C. P. (2021): Automated semantic segmentation of industrial point clouds using ResPointNet++. In: Automation in Construction, v. 130 (Oktober 2021).
https://doi.org/10.1016/j.autcon.2021.103874
-
Das, Moumita / Tao, Xingyu / Cheng, Jack C. P. (2021): BIM security: A critical review and recommendations using encryption strategy and blockchain. In: Automation in Construction, v. 126 (Juni 2021).
https://doi.org/10.1016/j.autcon.2021.103682
-
Mangal, Mohit / Li, Mingkai / Gan, Vincent J. L. / Cheng, Jack C. P. (2021): Automated clash-free optimization of steel reinforcement in RC frame structures using building information modeling and two-stage genetic algorithm. In: Automation in Construction, v. 126 (Juni 2021).
https://doi.org/10.1016/j.autcon.2021.103676
-
Liu, Yuhan / Li, Mingkai / Wong, Billy C. L. / Chan, Chun Man / Cheng, Jack C. P. / Gan, Vincent J. L. (2021): BIM-BVBS integration with openBIM standards for automatic prefabrication of steel reinforcement. In: Automation in Construction, v. 125 (Mai 2021).
https://doi.org/10.1016/j.autcon.2021.103654
-
Ma, Jun / Cheng, Jack C. P. / Jiang, Feifeng / Chen, Weiwei / Wang, Mingzhu / Zhai, Chong (2020): A bi-directional missing data imputation scheme based on LSTM and transfer learning for building energy data. In: Energy and Buildings, v. 216 (Juni 2020).
https://doi.org/10.1016/j.enbuild.2020.109941
-
Wang, Mingzhu / Kumar, Srinath Shiv / Cheng, Jack C. P. (2021): Automated sewer pipe defect tracking in CCTV videos based on defect detection and metric learning. In: Automation in Construction, v. 121 (Januar 2021).
https://doi.org/10.1016/j.autcon.2020.103438
-
Wang, Qian / Cheng, Jack C. P. / Sohn, Hoon (2017): Automated Estimation of Reinforced Precast Concrete Rebar Positions Using Colored Laser Scan Data. In: Computer-Aided Civil and Infrastructure Engineering, v. 32, n. 9 (August 2017).
https://doi.org/10.1111/mice.12293
-
Cheng, Jack C. P. / Venkataraman, Vignesh (2016): Analyzing relationships between project team compositions and green building certification in green building projects. In: Built Environment Project and Asset Management, v. 6, n. 5 (November 2016).
https://doi.org/10.1108/bepam-10-2015-0056
-
Tan, Yi / Fang, Yi / Zhou, Teng / Gan, Vincent J. L. / Cheng, Jack C. P. (2019): BIM-supported 4D acoustics simulation approach to mitigating noise impact on maintenance workers on offshore oil and gas platforms. In: Automation in Construction, v. 100 (April 2019).
https://doi.org/10.1016/j.autcon.2018.12.019
-
Wang, Qian / Sohn, Hoon / Cheng, Jack C. P. (2018): Automatic As-Built BIM Creation of Precast Concrete Bridge Deck Panels Using Laser Scan Data. In: Journal of Computing in Civil Engineering, v. 32, n. 3 (Mai 2018).
https://doi.org/10.1061/(asce)cp.1943-5487.0000754
-
Tan, Yi / Song, Yongze / Liu, Xin / Wang, Xiangyu / Cheng, Jack C. P. (2017): A BIM-based framework for lift planning in topsides disassembly of offshore oil and gas platforms. In: Automation in Construction, v. 79 (Juli 2017).
https://doi.org/10.1016/j.autcon.2017.02.008
-
Chen, Weiwei / Chen, Keyu / Cheng, Jack C. P. / Wang, Qian / Gan, Vincent J. L. (2018): BIM-based framework for automatic scheduling of facility maintenance work orders. In: Automation in Construction, v. 91 (Juli 2018).
https://doi.org/10.1016/j.autcon.2018.03.007
-
Kim, Min-Koo / Wang, Qian / Park, Joon-Woo / Cheng, Jack C. P. / Sohn, Hoon / Chang, Chih-Chen (2016): Automated dimensional quality assurance of full-scale precast concrete elements using laser scanning and BIM. In: Automation in Construction, v. 72 (Dezember 2016).
https://doi.org/10.1016/j.autcon.2016.08.035
-
Kumar, Srinath S. / Cheng, Jack C. P. (2015): A BIM-based automated site layout planning framework for congested construction sites. In: Automation in Construction, v. 59 (November 2015).
https://doi.org/10.1016/j.autcon.2015.07.008
-
Wang, Qian / Kim, Min-Koo / Cheng, Jack C. P. / Sohn, Hoon (2016): Automated quality assessment of precast concrete elements with geometry irregularities using terrestrial laser scanning. In: Automation in Construction, v. 68 (August 2016).
https://doi.org/10.1016/j.autcon.2016.03.014
-
Cheng, Jack C. P. / Lu, Qiqi / Deng, Yichuan (2016): Analytical review and evaluation of civil information modeling. In: Automation in Construction, v. 67 (Juli 2016).
https://doi.org/10.1016/j.autcon.2016.02.006
-
Mangal, Mohit / Cheng, Jack C. P. (2018): Automated optimization of steel reinforcement in RC building frames using building information modeling and hybrid genetic algorithm. In: Automation in Construction, v. 90 (Juni 2018).
https://doi.org/10.1016/j.autcon.2018.01.013
-
Cheng, Jack C. P. / Wang, Mingzhu (2018): Automated detection of sewer pipe defects in closed-circuit television images using deep learning techniques. In: Automation in Construction, v. 95 (November 2018).
https://doi.org/10.1016/j.autcon.2018.08.006