Rui-dong Chang
- Cost prediction of building projects using the novel hybrid RA-ANN model. In: Engineering, Construction and Architectural Management, v. 31, n. 6 (Februar 2023). (2023):
- Knowledge extraction for solving resource-constrained project scheduling problem through decision tree. In: Engineering, Construction and Architectural Management, v. 31, n. 7 (April 2023). (2023):
- What leads to the high capital cost of prefabricated construction in China: perspectives of stakeholders. In: Engineering, Construction and Architectural Management, v. 30, n. 2 (Oktober 2021). (2021):
- A system dynamic model for assessing the level of BIM implementation in construction phase: a China case study. In: Engineering, Construction and Architectural Management, v. 30, n. 4 (März 2022). (2022):
- Dynamic interactions between sustainability and competitiveness in construction firms. A transition perspective. In: Engineering, Construction and Architectural Management, v. 24, n. 5 (September 2017). (2017):
- Exploring the interactions among factors impeding the diffusion of prefabricated building technologies. Fuzzy cognitive maps. In: Engineering, Construction and Architectural Management, v. 26, n. 3 (April 2019). (2019):
- Sustainability Transition of the Chinese Construction Industry: Practices and Behaviors of the Leading Construction Firms. In: Journal of Management in Engineering (ASCE), v. 32, n. 4 (Juli 2016). (2016):
- Market Concentration and Competitive Intensity of the International Engineering Contracting Industry. In: Journal of Construction Engineering and Management, v. 145, n. 5 (Mai 2019). (2019):
- Discovering the Transition Pathways toward Sustainability for Construction Enterprises: Importance-Performance Analysis. In: Journal of Construction Engineering and Management, v. 143, n. 6 (Juni 2017). (2017):