Weng-Tat Chan
- Construction Resource Scheduling with Genetic Algorithms. In: Journal of Construction Engineering and Management, v. 122, n. 2 (Juni 1996). (1996):
- An application of genetic algorithms to precast production scheduling. In: Computers & Structures, v. 79, n. 17 (Juli 2001). (2001):
- Collaborative Scheduling over the Internet. In: Computer-Aided Civil and Infrastructure Engineering, v. 14, n. 1 (Januar 1999). (1999):