Toong-Khuan Chan
- Experimental Study of Link Quality Distribution in Sensor Network Deployment for Building Environment. In: Electronic Journal of Structural Engineering, n. 1 (Januar 2009). (2009):
- Adoption of the digitalised last planner system in infrastructure projects: an Australian case study. In: Construction Innovation. :
- Cost estimation for electric light and power elements during building design. A neural network approach. In: Engineering, Construction and Architectural Management, v. 22, n. 2 (März 2015). (2015):
- More than a survey: an interdisciplinary post-occupancy tracking of BER schools. In: Architectural Science Review, v. 55, n. 3 (August 2012). (2012):
- Risk Allocation Inefficiencies in Chinese PPP Water Projects. In: Journal of Construction Engineering and Management, v. 144, n. 4 (April 2018). (2018):
- Risks in PPP Water Projects in China: Perspective of Local Governments. In: Journal of Construction Engineering and Management, v. 143, n. 7 (Juli 2017). (2017):