Diogo Carvalho
- Construcción de vanos de 90m con cimbra autolanzable. Un caso practico. In: Hormigón y acero. :
- Bridge Engineering Optimization Opportunities Through Integrated Solutions: Design – Constructive Method. In: (2021): Developments in International Bridge Engineering. Springer, Cham (Deutschland), ISBN 978-3-030-59168-7. (2021):
- (2019): Structural design and globalization – the particular case of bridge construction equipment. Vorgetragen bei: IABSE Congress: The Evolving Metropolis, New York, NY, USA, 4-6 September 2019.
- (2018): Construction of 90m multi-span viaducts with span by span – A New Possibility in Bridge Engineering. Vorgetragen bei: IABSE Conference: Engineering the Developing World, Kuala Lumpur, Malaysia, 25-27 April 2018.
- (2019): General approach to safety and risk management in bridge construction. Vorgetragen bei: IABSE Symposium: Towards a Resilient Built Environment Risk and Asset Management, Guimarães, Portugal, 27-29 March 2019.
- New Frontiers in Multi-span Prestressed Concrete Deck Construction: A Case Study. In: Structural Engineering International, v. 31, n. 1 (Januar 2021). (2021):
- (2017): Organic Prestressing Impact in Multi-Span Large Deck Construction. Vorgetragen bei: IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017.