- How to combine different types of prefabricated components in a building to reduce construction costs and carbon emissions?. In: Journal of Building Engineering, v. 98 (Dezember 2024). (2024):
- Blockchain-based information framework for change management in EPC general contracting projects. In: Proceedings of the Institution of Civil Engineers - Engineering Sustainability. :
- An intelligent framework for rework risk identification in prefabricated construction processes based on compliance checking. In: Engineering, Construction and Architectural Management. :
- (2024): Research on Influencing Factors of Knowledge Transfer among Prefabricated Construction Workers. In: Buildings, v. 14, n. 5 (24 April 2024).
- (2024): Feasibility of Preparing Steel Slag–Ground Granulated Blast Furnace Slag Cementitious Materials: Synergistic Hydration, Fresh, and Hardened Properties. In: Buildings, v. 14, n. 3 (21 Februar 2024).
- (2022): Knowledge Transfer Characteristics of Construction Workers Based on Social Network Analysis. In: Buildings, v. 12, n. 11 (27 Oktober 2022).
- Prefabricated Construction Process Optimization Based on Rework Risk. In: Journal of Construction Engineering and Management, v. 148, n. 6 (Juni 2022). (2022):
- Research on the influencing factors of knowledge transfer among construction workers based on social cognitive theory. In: Engineering, Construction and Architectural Management, v. 30, n. 4 (März 2022). (2022):
- Prefabricated Housing Subsidy Analysis in China Based on an Evolutionary Game Model. In: Journal of Civil Engineering and Management, v. 27, n. 7 (11 Oktober 2021). (2021):
- Research on the rework risk core tasks in prefabricated construction in China. In: Engineering, Construction and Architectural Management, v. 28, n. 10 (Februar 2021). (2021):
- Study on factors that inhibit the promotion of SI housing system in China. In: Energy and Buildings, v. 88 (Februar 2015). (2015):