- Estimate-at-completion (EAC) prediction using Archimedes optimization with adaptive fuzzy and neural networks. In: Automation in Construction, v. 166 (Oktober 2024). (2024):
- Uncovering value creation factors for healthcare public-private partnership (PPP) projects. In: Engineering, Construction and Architectural Management. :
- (2023): Development of a Taxonomy for Causes of Changes in Construction Projects. In: Buildings, v. 14, n. 1 (31 Dezember 2023).
- Predicting Cost Impacts of Nonconformances in Construction Projects Using Interpretable Machine Learning. In: Journal of Construction Engineering and Management, v. 150, n. 1 (Januar 2024). (2024):
- Value Creation in PPP Projects Undertaken in the Turkish Healthcare Industry. In: Journal of Construction Engineering and Management, v. 149, n. 11 (November 2023). (2023):
- (2023): Assessment of Barriers to the Implementation of Smart Contracts in Construction Projects—Evidence from Turkey. In: Buildings, v. 13, n. 8 (2 August 2023).
- Identification and Prioritization of Key Performance Indicators for the Construction Small and Medium Enterprises. In: Teknik Dergi, v. 33, n. 5 (September 2022). (2022):
- Reasons for Performance Differences among ISO 9001:2015–Certified Construction Companies in the Perspective of TQM Elements. In: Journal of Management in Engineering (ASCE), v. 37, n. 5 (September 2021). (2021):
- Investigation of drivers and modes of differentiation in Turkish construction industry. In: Engineering, Construction and Architectural Management, v. 20, n. 4 (Juni 2013). (2013):
- Development of a conceptual life cycle performance measurement system for build–operate–transfer (BOT) projects. In: Engineering, Construction and Architectural Management, v. 28, n. 6 ( 2021). (2021):
- İnşaat Sektöründe Mesleki Eğitim Performans Göstergeleri. In: Teknik Dergi, v. 30, n. 3 (Mai 2019). (2019):
- Determination of Important Building Construction Nuisances in Residential Areas on Neighbouring Community. In: Teknik Dergi, v. 32, n. 2 (März 2021). (2021):
- Evaluation of Delay Causes for BOT Projects Based on Perceptions of Different Stakeholders in Turkey. In: Journal of Management in Engineering (ASCE), v. 35, n. 1 (Januar 2019). (2019):
- Effects of Risk Attitude and Controllability Assumption on Risk Ratings: Observational Study on International Construction Project Risk Assessment. In: Journal of Management in Engineering (ASCE), v. 34, n. 6 (November 2018). (2018):
- Alignment of Project Management With Business Strategy in Construction: Evidence From the Turkish Contractors. In: Journal of Civil Engineering and Management, v. 21, n. 1 (Dezember 2014). (2014):
- (2019): Implementation of Genetic Algorithm Integrated with the Deep Neural Network for Estimating at Completion Simulation. In: Advances in Civil Engineering, v. 2019 ( 2019).
- A Computerized Method for Delay Risk Assessment Based on Fuzzy Set Theory using MS Project™. In: KSCE Journal of Civil Engineering, v. 22, n. 8 (November 2017). (2017):
- Strategic Group Analysis in the Construction Industry. In: Journal of Construction Engineering and Management, v. 135, n. 4 (April 2009). (2009):