- (2024): Generation of Construction Scheduling through Machine Learning and BIM: A Blueprint. In: Buildings, v. 14, n. 4 (27 März 2024).
- Project procurement systems for mechanical, electrical and piping projects in Saudi Arabia. An empirical assessment. In: Engineering, Construction and Architectural Management, v. 24, n. 6 (November 2017). (2017):
- ISO 9000 Quality Standards in Construction. In: Journal of Management in Engineering (ASCE), v. 15, n. 6 (November 1999). (1999):
- Contractor Prequalification in Saudi Arabia. In: Journal of Management in Engineering (ASCE), v. 12, n. 2 (März 1996). (1996):
- Owner Involvement in Construction Projects in Saudi Arabia. In: Journal of Management in Engineering (ASCE), v. 8, n. 2 (April 1992). (1992):
- Effect of silica fume on the concrete-steel bond. In: Building Research & Information, v. 25, n. 6 ( 1997). (1997):
- Planning and scheduling concrete repair work — A case study. Case study of contractors' errors in scheduling concrete repairs, exemplar for overcoming slippage. In: Building Research & Information, v. 24, n. 6 ( 1996). (1996):
- Use of microsilica in concrete construction. Reviews state‐of‐the‐art silica fume concrete and discusses the influence silica fume has on the various properties of concrete and the effect on the bond between parent concrete and new concrete. In: Building Research & Information, v. 24, n. 1 ( 1996). (1996):
- Performance Evaluation of International Contractors in Saudi Arabia. In: Journal of Professional Issues in Engineering Education and Practice, v. 142, n. 1 (Januar 2016). (2016):
- Design Quality Management Activities. In: Journal of Professional Issues in Engineering Education and Practice, v. 122, n. 3 (Juli 1996). (1996):
- Comparison of Delay Analysis Methodologies. In: Journal of Construction Engineering and Management, v. 124, n. 4 (Juli 1998). (1998):
- Quality practices in design organizations. In: Construction Management and Economics, v. 17, n. 6 (November 1999). (1999):
- Quality of Pavement Construction in Saudi Arabia. In: Practice Periodical on Structural Design and Construction, v. 6, n. 3 (August 2001). (2001):
- Determining Schedule Impact: Working Practice. In: Practice Periodical on Structural Design and Construction, v. 3, n. 4 (November 1998). (1998):
- Design Fee versus Design Deficiency. In: Journal of Architectural Engineering (ASCE), v. 4, n. 2 (Juni 1998). (1998):
- Role of Communication and Coordination in Project Success: Case Study. In: Journal of Performance of Constructed Facilities (ASCE), v. 29, n. 4 (August 2015). (2015):
- Evaluation and Rehabilitation of Concrete Pier. In: Journal of Performance of Constructed Facilities (ASCE), v. 11, n. 3 (August 1997). (1997):